- AC output
- 0.00 to 10.00 kV at 10 mA, on 7460
- DC output
- 0.00 to 10.00 kV at 5000 μA, on 7462
- Voltage resolution
- 0.01 kV
- Leakage limits, AC
- Upper 0 to 10.0 mA, lower 0.1 to 10.0 mA
- Leakage limits, DC
- Upper 0 to 5000 μA, lower 0.1 to 5000 μA
- Frequency
- 50 or 60 Hz, selectable
- Program memory
- 50 groups, which can be linked into a sequence
- Arc detection
- Nine ranges below 7.00 kV, eight ranges at or above 7.00 kV
- Discharge
- At least 200 ms after the test
- Body
- 432 × 147 × 500 mm, 24 kg
A high voltage test is a destructive test that is expected not to destroy anything, and the instrument earns its place by making the same test repeatable across a shift and across a production run. This pair is built for that single job at the top of the voltage range.
Product overview
The pair covers the two ways a withstand test can be applied: one model produces an alternating output, the other a direct one. They share a body, a control layout and a memory structure, and neither carries the other function, so the choice is made by the test rather than by the budget.
The front panel is arranged for sequence entry. Test and reset buttons sit at the left, the display is centred above a block of function keys and a numeric keypad, and the high voltage terminals are at the right behind the warning marking. The rear carries the high voltage output, the mains inlet, the earth stud, two scanner connectors, remote signal connectors and a serial port.
How the high voltage withstand tester works
The instrument raises its output from zero over a programmed rise time rather than switching it on at the set value. That matters for a capacitive item, where an instant step would draw a large charging current and trip a limit that the steady state would never reach.
Once the voltage is at the set value the instrument holds it for the test time and measures the current through the item. The current is compared with an upper limit, which is the breakdown criterion, and a lower limit, which catches an item that is not connected. A failure is reported by buzzer, by display and by lamp at the same time.
At the end of the test the output is removed and a discharge period is enforced before the item can be handled. The discharge time is part of the specification rather than an operating habit, which is the difference between a bench that is safe by design and one that is safe by discipline.
Arc detection watches for the fast transient that a local flashover produces. Its usable range narrows as the output voltage rises, because the transient sits on top of a larger signal and a detector set for the lower range would trip on the output itself.
How to select the right model
The first question is the waveform. An alternating test is what most product standards for mains-powered equipment call for, and a direct test is used where the insulation is specified under a steady field, or where the capacitance of the item would draw too much current from an alternating output.
The second is the leakage limit. The two models differ in the units they work in as well as in the range, and the limit has to come from the standard rather than from the instrument’s maximum.
The third is the sequence. Where a product has to be taken through more than one voltage or held for more than one duration, the ability to link groups into a chain removes the operator from the middle of the test, and that is worth more on a production line than any single specification.
The fourth is the fixture. Two scanner connectors at the rear suggest a multi-point fixture; if the bench only ever tests one point, they will stay unused, and the cabling can be kept simple.
Measurement limitations and selection considerations
The instrument holds a voltage for a time and judges the current against limits. It does not ramp to breakdown and record the curve, so it can say that an item failed above a limit but not at what voltage it failed. Where the breakdown voltage is the result being sought, a different instrument is needed.
Leakage current includes the current through the fixture, the leads and any scanner in the path. On an item with very low leakage that residual can be a large part of the reading, so the lower limit has to be set with the fixture connected and characterised.
The two models are single-purpose. A bench that needs both an alternating and a direct test either runs two instruments or moves to a combined model elsewhere in the series, and that decision should be taken before the fixture is designed, because the two arrangements need different cabling.
Finally, the voltage class sets the clearance around the test area. At this level the leads, the probe spacing and the bench layout are part of the measurement, not accessories to it, and a test that passes on a well-laid-out bench can fail on a crowded one through leakage across the fixture alone.
Every value below is taken from source documentation. Where a parameter is not stated in the available material it is marked as information required rather than estimated.