- Measured quantities
- Insulation resistance, volume resistivity, surface resistivity and leakage current, shown together
- Resistance range
- 10 kΩ to 10 TΩ; to 100 PΩ or 1 PΩ on the two larger models
- Current range
- 10 pA to 1 mA; 0.1 fA to 2 mA; 0.01 pA to 2 mA
- Test voltage
- 0.5 to 1000 V DC, programmable
- Voltage accuracy
- ±0.25% ±0.5 V above 10 V; ±1% ±0.5 V at or below 10 V
- Charge and test time
- 0 to 999 s each, programmable
- Ranging
- 7 ranges, automatic or manual
- Guard terminal
- Shielded input with a guard connection to the specimen screen
- Interfaces
- USB host and device, RS232, HANDLER, RS485
Volume resistivity and surface resistivity are two different failures of the same material. One is a material that conducts through its thickness; the other is a surface that has become leaky through handling, humidity or contamination. A meter that reports only insulation resistance cannot tell them apart.
Product overview
This is a bench instrument with a programmable direct voltage source and an electrometer input, arranged so that a specimen in a three-electrode fixture can be measured for volume resistivity, surface resistivity, insulation resistance or leakage current.
Three models cover different depths of measurement. The compact one reads 10 kΩ to 10 TΩ with a 10 pA bottom end on the current. The two larger ones reach 100 PΩ and 1 PΩ, with current resolution down to 0.1 fA and 0.01 pA respectively. All three apply 0.5 V to 1000 V, all three have a guard terminal and a shielded input, and all three offer the same five interfaces.
The specimen handling is what differs most in practice. Solid sheets go into an electrode box with a three-ring electrode; liquids and pastes go into a liquid electrode; films may need a lower voltage and a longer electrification time than the standard default.
How the volume and surface resistivity meter works
A direct voltage is applied between two electrodes, and the current that flows is measured. For volume resistivity the electrodes are on opposite faces, so the current passes through the thickness of the specimen; for surface resistivity they are on the same face, and a guard ring intercepts the current that would otherwise travel through the body.
The conversion to resistivity is geometry. Volume resistivity is the measured resistance multiplied by the electrode area and divided by the specimen thickness. Surface resistivity is the measured resistance multiplied by a factor set by the ring dimensions. Both are computed inside the instrument, which is why the electrode type has to be selected before the number means anything.
The guard terminal is the part that makes the surface measurement work. Connected to a conductive ring or a screen around the measuring electrode, it collects the leakage current and returns it to the source instead of letting it add to the measured current. Without it, a surface reading on a humid day drifts upward and never settles.
Charge and test time exist for the same reason. An insulating specimen does not reach a steady current instantly; the absorption current falls for seconds or minutes. The instrument holds the voltage for the programmed charge time, then measures over the programmed test time, and reports the value at the end.
How to select the right volume and surface resistivity meter
Start with the highest resistance the material can show. A conventional rubber compound may sit at 10¹² to 10¹⁴ Ω, which the compact model covers; a good film or a liquid dielectric can sit several decades higher, and that is where the two large models are needed. The difference between 100 PΩ and 1 PΩ is a factor of a hundred, and it matters only at the top of the range.
Then the lowest current to be resolved. Leakage through a thin specimen at low voltage can be below a picoamp, and the model that resolves 0.1 fA is the one that can measure it in a reasonable time rather than waiting for the display to settle on a number it cannot resolve.
Then the specimen form, because it fixes the electrode. Sheet material suits the electrode box; liquid and paste suit the liquid electrode; a specimen whose area is unusual may need a custom ring. The electrode is a larger share of the measurement uncertainty than the instrument in most laboratories.
Then the voltage the standard requires. All three models span 0.5 V to 1000 V, so this rarely selects between them, but the accuracy at low voltage does differ from the accuracy at high voltage, and a test written at 10 V sits in the less accurate band.
Finally the interface and the record. A laboratory needs the USB record and the serial link; a production line needs the handler output and a comparator. All three models carry the same five interfaces, so this does not narrow the choice.
Measurement limitations and selection considerations
The reading depends on the electrification time, and the standards know it. A value quoted without the voltage, the time and the electrode geometry is not comparable with anything, which is why the instrument records all three.
Humidity dominates surface resistivity. A specimen that has absorbed water from the air will read low, and the reading will keep falling while it is measured. The temperature and humidity display is there to make the condition visible; it does not correct the result.
Specimen preparation matters more than instrument accuracy. Surface contamination from fingers, release agents or dust changes the surface path; a specimen that has been handled without gloves is not the same specimen. Cleaning procedure belongs in the test method, not in the instrument.
The guard connection has to be right. A guard ring that is not connected, or connected to the wrong face, turns a surface measurement into a mixture of surface and volume current, and the result is plausible but wrong. This is the most common setup error on this type of instrument.
Finally, the instrument measures one spot on one specimen. Insulating materials vary from batch to batch and across a sheet, and a single reading is a sample, not a specification. The number of specimens and their conditioning are part of the test plan, not of the instrument choice.
Every value below is taken from source documentation. Where a parameter is not stated in the available material it is marked as information required rather than estimated.