Product type

Pressure Test Pumps

A pressure test pump fills a closed system with liquid and raises the pressure in it to a figure that has to be held for a period. It exists to answer a yes-or-no question about a pipe run, a vessel or an installed system: does it hold. Nothing about the pump is a measurement in the usual sense - the figure comes from a gauge and the judgement comes from whether that figure stays where it was put.

What a pressure test pump is

A pressure test pump fills a closed system with liquid and raises the pressure in it to a figure that has to be held for a period. It exists to answer a yes-or-no question about a pipe run, a vessel or an installed system: does it hold. Nothing about the pump is a measurement in the usual sense - the figure comes from a gauge and the judgement comes from whether that figure stays where it was put.

It is not a calibrator, and the two are frequently confused because both generate pressure by hand. A calibrator produces a pressure that is known to a stated accuracy so that an instrument can be checked against it; the point of the exercise is the accuracy of the reference. A test pump produces pressure so that a system can be proved sound; the point is that the pressure holds, and the gauge fitted to the pump is a process gauge rather than a reference.

What decides a test pump is the test pressure, the volume of the system being filled and the connection the system presents. The pump has to be able to reach the test figure with margin to read it, it has to be able to fill the system in a reasonable number of strokes, and it has to connect to whatever the installation ends in. Each of those is settled by the job rather than by the pump catalogue.

How a pressure test pump measures

The mechanism is a piston in a small cylinder driven by a lever. On the upstroke liquid is drawn from a reservoir through a strainer and a check valve; on the downstroke it is pushed into the system. Because the system is closed and liquid is very nearly incompressible, each stroke raises the pressure by a small amount and the pressure stays where it is left rather than relaxing back. That is why a hand pump of modest size can hold a large system at pressure: it is filling a volume that cannot get any smaller, not storing energy in the fluid.

The check valve is what turns the pump into a test instrument. With its shut-off closed, liquid passes from the pump into the system but not back, so the lever can be left alone and the gauge watched. A relief valve provides the other half of the arrangement: a controlled way to release the pressure before anything is disconnected, which on a closed liquid system under pressure is not an optional convenience.

The gauge is the only measuring element in the chain, and its condition decides what the test is worth. The figure being watched is not the test pressure itself but the small fall in it over the hold period, so a gauge that reads consistently matters more than one that reads to a fine scale, and a damped or vibration-resistant movement is normally fitted because the needle has to be steady enough for a slow change to be visible.

Configuration choices

Most of the specification is fixed by these decisions rather than by the accuracy class. Each one constrains the next, which is why they are settled in order.

ConfigurationOptions to fixWhat it actually decides
Maximum test pressure required The gauge range and the pressure rating of the body, the hose and the connectionsWhat the assembly may be taken to. The limiting figure is the lowest rating in the chain rather than the gauge range, and a hose or a seal rated below the gauge turns the gauge into a misleading indication.
Volume of the system to be filled Reservoir capacity, cylinder bore and lever lengthHow many strokes the filling takes before the pressure begins to build, and whether the reservoir is exhausted before the system is full. A large system filled from a small reservoir needs refilling part way through.
Medium used for the test Water, or a fluid appropriate to the system being testedWhether the test itself introduces a problem. Liquid is used rather than gas above modest pressures because a compressed gas stores energy that a burst joint releases suddenly, and the fluid left in the system afterwards has to be acceptable to it.
Process connection The connection at the pump outlet and the adaptor to the system under testWhether the pump can be connected at all, and whether that joint will hold the test pressure. The connection to the system is one of the joints most likely to leak during a test, which makes it a candidate to be confused with a fault in the system.
Relief and drain arrangement Relief valve position and its routing back to the reservoirHow the pressure is released and where the liquid goes. Releasing a pressurised system without a vented path puts the fluid somewhere unintended, and on a site that matters as much as the reading.

How to choose a pressure test pump

FactorWhy it decides the answerHow to settle it before enquiring
The test pressure the specification calls for It sets the gauge range and the rating of every part of the assembly, and it comes from the system specification rather than from what the pump can reach.Give the test figure and the specification it comes from, together with the hold time and the permitted drop, if the acceptance criterion is defined.
The volume of the system It decides how long filling takes and whether the reservoir is large enough to fill the system in one go.Give the pipe size and the total length, or the internal volume, and say whether the pump can be refilled during the test.
Whether the system is pipework or a pressure vessel The two are proved to different rules, and a hand pump intended for pipework commissioning is not the instrument for a coded vessel test.Say what is being tested and to which standard, since a coded test needs a recorded pressure trace and an instrument with its own calibration rather than a process gauge.
The connection at the test point It decides whether an adaptor is needed and whether the joint will hold the test pressure.Give the thread or fitting at the point where the pump will connect, and note whether it is easily accessible.
Where the test is carried out Access, the availability of water and the room to work the lever all follow from the site rather than from the instrument.Describe the location and whether water can be carried to it, since a reservoir is filled by hand.

The nearest alternatives

These are the types an enquiry for a pressure test pump usually turns out to be, and the point at which the choice is genuinely decided.

Nearest alternativeWhat separates it from a pressure test pump
Calibration pumps Generates pressure so that an instrument can be checked against a reference. The figure is the measurement and its accuracy is the point; on a test pump the figure only has to hold. Choosing between them is a question of which of those two jobs is being done, and a pump built for one is not a substitute for the other.
Pressure calibrators Combines a reference pressure with an electrical channel so a transmitter can be checked end to end. It is an instrument with a stated accuracy; a test pump carries a process gauge and no accuracy statement for the pressure it generates.
Reference standards The traceable reference at the top of a calibration chain. Used where the uncertainty of the check has to be documented and defended, which is a different requirement from proving that a pipe installation holds water.

Where a test has to produce a record rather than a verdict, the instrument is a pressure calibrator or a data logger with its own calibration, not a hand pump with a gauge on it.

What to include in the enquiry

The first reply can be a quotation rather than a set of questions if the enquiry carries these. Where a figure is not known, send the duty description and we will confirm what it implies.

  1. The test pressure required, and the specification it comes from
  2. The volume to be filled, from pipe size and length or from the system drawing
  3. The connection at the test point
  4. The medium acceptable to the system being tested
  5. Whether the test is on pipework or on a pressure vessel
  6. The hold time and permitted pressure drop, if the criterion is defined
  7. Whether the test has to be recorded, and in what form
  8. The site conditions, including how the pump will be filled and moved
  9. Quantity, destination port and required delivery date

Available products

1 model in Pressure Test Pumps

Yellow rectangular water tank with an aluminium pump body on top, a chrome lever with a black grip, a small pressure gauge, a red relief knob and a coiled orange hose

Pressure Test Pumps

Manual Pressure Test Pump

Hand-operated hydrostatic test pump with an 18 litre tank, a brass check valve and a reinforced hose, used to pressure-test water pipe, underfloor heating loops and plumbing installations.

Application
Pressure testing of PPR water pipe, mains pipe, underfloor heating loops and plumbing installations
Gauge fitted
25 MPa on the standard version; a 7 MPa oil gauge on the upgraded version; 40 or 60 MPa on the enlarged version
Tank
18 litres, iron, 1.35 mm wall, sprayed finish, 300 × 200 × 90 mm
Pump body
Aluminium; thickened on the upgraded and enlarged versions

Also in Calibration & Metrology

Other product types in this category

Every type we quote for under Calibration & Metrology. A type with no link yet is still quoted for - it is described on the Calibration & Metrology overview, and gets a page of its own as soon as a model is published against it.

Frequently asked

Pressure Test Pumps questions

Is a test pump the same as a calibration pump?

No, and the distinction matters at the point of purchase. A calibration pump generates a pressure that is known to a stated accuracy, because the job is to check an instrument against a reference and the accuracy is the whole point. A test pump generates a pressure that has to be held, because the job is to prove that a system is sound. A test pump carries a process gauge with no accuracy statement for the pressure it generates, and a calibration pump is not built to carry enough liquid to fill a pipe run.

Why is liquid used rather than air?

Because a compressed gas stores energy. Air at a high pressure holds an amount of energy that is released suddenly if a joint lets go, which makes a pneumatic test of a large system a hazard rather than an inspection. A liquid is very nearly incompressible, so the energy stored in a liquid test is a small fraction of the energy stored in a gas test at the same pressure, and a failure releases a jet rather than a blast. That is why the practical rule is liquid above modest pressures and gas only where liquid would be unacceptable to the system.

How is the system judged to have passed?

By whether the pressure holds. The run is brought to the test figure, the pump is isolated behind its check valve, and the gauge is watched over the hold period. A reading that falls indicates a leak somewhere in the circuit, and the rate of fall is a rough guide to its size. Because the gauge is the only instrument involved, its condition and its damping matter: the change being looked for is often small against a scale that also has to show the test pressure.

Why can the test pressure not simply be raised to be safe?

Because the test is meant to prove the system, not to damage it. A pressure well above what the installation will see in service does not demonstrate more about its fitness, and an excessive test pressure shortens the life of a pipe or deforms it, which turns a commissioning check into the cause of the failure it was meant to catch. The test figure comes from the specification for the system, and the pump is then chosen to cover that figure with enough scale above it to read it properly.

What has to be recorded for the test to count?

That depends on the specification being worked to. Where the requirement is a signed record with a pressure trace and a stated uncertainty, a hand pump and a process gauge cannot produce one, and the instrument is a calibrated recorder or a calibrator with a logging function. Where the requirement is that the installation holds and somebody has seen it, a pump and a gauge are sufficient. Establishing which of the two applies before choosing the instrument is what prevents a commissioning check being repeated with different equipment.

Quoting for Pressure Test Pumps

Send the specification and we will confirm the matching model, availability and lead time. Minimum order quantity is 1 pc.

Request for quotation

Request a quotation - Pressure Test Pumps

Send the technical detail and we will confirm availability, lead time and terms. In-stock items ship within 48 hours; customized specifications typically take 2-10 days. Minimum order quantity is 1 pc.

The more of this you can give us, the fewer exchanges are needed before we can quote.
No file chosen
Datasheet, drawing, BOM or photograph. One file, up to 10 MB (PDF, Office, image or ZIP).

By submitting this form you agree that we may contact you about this enquiry. We do not sell or share enquiry data. See our privacy policy.

Items held in stock are dispatched within 48 hours of order confirmation. Customized specifications are produced to order and typically ship within 2 to 10 days. Transit time then depends on the shipping method and destination.

Request a Quote WhatsApp